Critical ASTM/IEEE Standards
-
Breakdown Voltage: >56 kV (ASTM D877)
-
Interfacial Tension: >28 dynes/cm (ASTM D971)
-
Dissolved Gas: H₂ <100 ppm, C₂H₂ <1 ppm (IEEE C57.104)
-
Particulate: NAS 1638 Class 6 or cleaner
Mobile Purification Units for Substations
Features for Field Use:
-
Trailered systems with 50 GPH capacity
-
HEPA vacuum dehydration (<10 ppm H₂O)
-
Dual-stage filtration: 10µm → 3µm absolute
-
DGA (Dissolved Gas Analysis) monitoring
Compliance Workflow
-
Pre-test oil (BDV, IFT, DGA)
-
Purify until parameters met:
-
Vacuum: 0.1 mbar @ 60°C
-
Filtration: β₃(c)=1000
-
-
Post-purification validation testing
Cost of Non-Compliance
A 345kV substation outage averages $9,200/hour. Fines for oil-related failures reach $500K under NERC PRC-005.
Conclusão
Mobile purifiers enable “condition-based maintenance” – reducing substation OPEX by 35% vs scheduled replacements.